{"id":19934,"date":"2015-02-05T05:00:49","date_gmt":"2015-02-05T11:00:49","guid":{"rendered":"http:\/\/www.universalweather.com\/blog\/?p=19934"},"modified":"2024-04-09T11:47:41","modified_gmt":"2024-04-09T16:47:41","slug":"north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap","status":"publish","type":"post","link":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/","title":{"rendered":"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap"},"content":{"rendered":"<p><em>This business aviation blog post continues from our article last week, entitled &#8220;<a href=\"http:\/\/www.universalweather.com\/blog\/2015\/02\/north-atlantic-regional-data-link-mandate-part-1-implementation\/\" target=\"_blank\" rel=\"noopener\">North Atlantic Regional Data Link Mandate: Part 1 \u2013 Implementation<\/a>.&#8221;<\/em><\/p>\n<p>The objective of the North Atlantic Data Link Mandate (NAT DLM) is to improve communication, surveillance, and air traffic control intervention capabilities within the North Atlantic Track (NAT) region. Operators should be familiar with implementation of phase 2 of NAT DLM as part 2A will go into effect February 5, 2015. Ensure flight plans are filed correctly, with all applicable navigation (nav) equipment categories completed.<\/p>\n<p>The following is an overview of what you need to know:<\/p>\n<h2>1. Mandate objectives<\/h2>\n<p>The goal by 2018 is to have 90% of aircraft operating in NAT airspace \u2013 at Flight Level (FL) 290 and above \u2013 equipped with Future Air Navigation System (FANS 1\/A) or equivalent Automatic Dependent Surveillance-Contract (ADS-C) and Controller-Pilot Data Link Communications (CPDLC) equipment. By 2020 the objective is to have 95% of aircraft transiting the NATs to be equipped as above.<\/p>\n<h2>2. NAT DLM implementation<\/h2>\n<p>Phase 2A of the NAT DLM commences February 5, 2015, and covers all NATs within the NAT Organized Track System (OTS) from FLs 350 to 390 inclusive. For more information on NAT DLM, please see our article entitled: <a href=\"http:\/\/www.universalweather.com\/blog\/2013\/09\/north-atlantic-data-link-mandate-what-you-need-to-know\/\" target=\"_blank\" rel=\"noopener\">North Atlantic Data Link Mandate \u2013 What You Need to Know<\/a>. Note that this applies to all aircraft operating on or at any point along these tracks. Phase 2B goes into effect December 7, 2017, and covers operations FLs 350-390 inclusive throughout the International Civil Aviation Organization (ICAO) NAT Region. A little farther down the road, commencing January 30, 2020, new requirements will cover operations at FL 290 and above throughout the ICAO NAT Region. When all these changes have been implemented, the term &#8220;Minimum Navigation Performance Specification&#8221; will no longer be used. In its place will be the term &#8220;Performance-Based Navigation Environment,&#8221; in line with ICAO 2012 long-term goals.<\/p>\n<h2>3. ATS surveillance airspace<\/h2>\n<p>This is airspace where surveillance is provided by radar and\/or automatic dependent surveillance \u2013broadcast (ADS-B) coverage. Within the boundaries of Air Traffic Service (ATS) surveillance airspace, you may operate without CPDLC so long as the aircraft is suitably equipped (transponder\/ADS-B Extended Squitter transmitter) <u>and<\/u> the entirety of the flight planned route is within ATS surveillance coverage. Eventually you&#8217;ll require ADS-B to travel through ATS surveillance airspace, but it&#8217;s unknown at this time when <a href=\"http:\/\/www.universalweather.com\/blog\/tag\/ads-b\/\" target=\"_blank\" rel=\"noopener\">ADS-B mandates<\/a> will be implemented.<\/p>\n<h2>4. Boundaries of ATS surveillance airspace<\/h2>\n<p><strong>Northern boundary:<\/strong> 64N000W\u201368N010W\u201369N020W\u201368N030W\u201367N040W\u201369N050W\u201370N060W\u2013 ADSAM.<\/p>\n<p><strong>Southern boundary:<\/strong> RATSU (61N000W) \u201361N020W\u2013 63N030W\u2013 62N040W &#8211; 61N050W-SAVRY.<\/p>\n<h2>5. Additional information<\/h2>\n<p>Additional information and ICAO documentation outlining guidelines for these changes can be found in information <a href=\"http:\/\/www.faa.gov\/about\/office_org\/headquarters_offices\/avs\/offices\/afs\/afs400\/afs470\/media\/NAT.pdf\" target=\"_blank\" rel=\"noopener\">published<\/a> by the FAA. You may also review the <a href=\"\\www.faa.gov\\air_traffic\\publications\\notices\" target=\"_blank\" rel=\"noopener\">FAA notice<\/a> issued in December 2014.<\/p>\n<h2>Conclusion<\/h2>\n<p>Over the long term, NAT DLM mandates, along with other future changes such as ADS-B requirements in the ATS surveillance airspace, will be positive for GA operators. Collision risks will be reduced to enable NAT Target Level of Safety to be met. One immediate benefit, even for operators not CPDLC-equipped, is that these changes will eliminate a large volume of North Atlantic communication over VHF radio.<\/p>\n<h2>Questions?<\/h2>\n<p>If you have any questions about this article or would like flight planning assistance for your next trip, contact me at <a href=\"mailto:markmiller@univ-wea.com\">markmiller@univ-wea.com<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The objective of the North Atlantic Data Link Mandate (NAT DLM) is to improve communication, surveillance, and air traffic control intervention capabilities within the North Atlantic Track (NAT) region. Operators should be familiar with implementation of phase 2 of NAT DLM as part [&#8230;]<\/p>\n","protected":false},"author":58,"featured_media":42606,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[154,1150,17],"feed_exclusion":[],"class_list":["post-19934","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-best-practice","tag-aviation-regulatory-issues","tag-data-link","tag-flight-planning"],"acf":{"stealth_publish":false},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap<\/title>\n<meta name=\"description\" content=\"The objective of the North Atlantic Data Link Mandate (NAT DLM) is to improve communication, surveillance, and air traffic control intervention capabilities within the North Atlantic Track (NAT) region. Operators should be familiar with implementation of phase 2 of NAT DLM as part 2A will go into effect February 5, 2015.. Ensure flight plans are filed correctly, with all applicable navigation (nav) equipment categories completed.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap\" \/>\n<meta property=\"og:description\" content=\"The objective of the North Atlantic Data Link Mandate (NAT DLM) is to improve communication, surveillance, and air traffic control intervention capabilities within the North Atlantic Track (NAT) region. Operators should be familiar with implementation of phase 2 of NAT DLM as part 2A will go into effect February 5, 2015.. Ensure flight plans are filed correctly, with all applicable navigation (nav) equipment categories completed.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/\" \/>\n<meta property=\"og:site_name\" content=\"Universal\u00ae Operational Insight Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/universalweathr\" \/>\n<meta property=\"article:published_time\" content=\"2015-02-05T11:00:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-09T16:47:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mark Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@universalweathr\" \/>\n<meta name=\"twitter:site\" content=\"@universalweathr\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mark Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/\"},\"author\":{\"name\":\"Mark Miller\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4\"},\"headline\":\"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap\",\"datePublished\":\"2015-02-05T11:00:49+00:00\",\"dateModified\":\"2024-04-09T16:47:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/\"},\"wordCount\":542,\"image\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg\",\"keywords\":[\"aviation regulatory issues\",\"data link\",\"flight planning\"],\"articleSection\":[\"Bizav Best Practice\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/\",\"url\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/\",\"name\":\"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap\",\"isPartOf\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg\",\"datePublished\":\"2015-02-05T11:00:49+00:00\",\"dateModified\":\"2024-04-09T16:47:41+00:00\",\"author\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4\"},\"description\":\"The objective of the North Atlantic Data Link Mandate (NAT DLM) is to improve communication, surveillance, and air traffic control intervention capabilities within the North Atlantic Track (NAT) region. Operators should be familiar with implementation of phase 2 of NAT DLM as part 2A will go into effect February 5, 2015.. Ensure flight plans are filed correctly, with all applicable navigation (nav) equipment categories completed.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#primaryimage\",\"url\":\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg\",\"contentUrl\":\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg\",\"width\":1600,\"height\":900,\"caption\":\"North Atlantic Regional Data Line Mandate \u2013 Part 2: NAT DLM Roadmap\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.universalweather.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/#website\",\"url\":\"https:\/\/www.universalweather.com\/blog\/\",\"name\":\"Universal\u00ae Operational Insight Blog\",\"description\":\"Expert insight and practical tips for business-aviation operations\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.universalweather.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4\",\"name\":\"Mark Miller\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg\",\"caption\":\"Mark Miller\"},\"description\":\"Mark is a former Air Traffic Controller with more than 35 years' experience in aviation. Prior to his departure, Mark served as the Universal Supervisor of Technical Planning, and was with Universal for approximately 27 years.\",\"url\":\"https:\/\/www.universalweather.com\/blog\/author\/markmiller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap","description":"The objective of the North Atlantic Data Link Mandate (NAT DLM) is to improve communication, surveillance, and air traffic control intervention capabilities within the North Atlantic Track (NAT) region. Operators should be familiar with implementation of phase 2 of NAT DLM as part 2A will go into effect February 5, 2015.. Ensure flight plans are filed correctly, with all applicable navigation (nav) equipment categories completed.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/","og_locale":"en_US","og_type":"article","og_title":"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap","og_description":"The objective of the North Atlantic Data Link Mandate (NAT DLM) is to improve communication, surveillance, and air traffic control intervention capabilities within the North Atlantic Track (NAT) region. Operators should be familiar with implementation of phase 2 of NAT DLM as part 2A will go into effect February 5, 2015.. Ensure flight plans are filed correctly, with all applicable navigation (nav) equipment categories completed.","og_url":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/","og_site_name":"Universal\u00ae Operational Insight Blog","article_publisher":"https:\/\/www.facebook.com\/universalweathr","article_published_time":"2015-02-05T11:00:49+00:00","article_modified_time":"2024-04-09T16:47:41+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg","type":"image\/jpeg"}],"author":"Mark Miller","twitter_card":"summary_large_image","twitter_creator":"@universalweathr","twitter_site":"@universalweathr","twitter_misc":{"Written by":"Mark Miller","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#article","isPartOf":{"@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/"},"author":{"name":"Mark Miller","@id":"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4"},"headline":"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap","datePublished":"2015-02-05T11:00:49+00:00","dateModified":"2024-04-09T16:47:41+00:00","mainEntityOfPage":{"@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/"},"wordCount":542,"image":{"@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#primaryimage"},"thumbnailUrl":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg","keywords":["aviation regulatory issues","data link","flight planning"],"articleSection":["Bizav Best Practice"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/","url":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/","name":"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap","isPartOf":{"@id":"https:\/\/www.universalweather.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#primaryimage"},"image":{"@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#primaryimage"},"thumbnailUrl":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg","datePublished":"2015-02-05T11:00:49+00:00","dateModified":"2024-04-09T16:47:41+00:00","author":{"@id":"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4"},"description":"The objective of the North Atlantic Data Link Mandate (NAT DLM) is to improve communication, surveillance, and air traffic control intervention capabilities within the North Atlantic Track (NAT) region. Operators should be familiar with implementation of phase 2 of NAT DLM as part 2A will go into effect February 5, 2015.. Ensure flight plans are filed correctly, with all applicable navigation (nav) equipment categories completed.","breadcrumb":{"@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#primaryimage","url":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg","contentUrl":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/02\/updated-north-atlantic-mandate-business-aviation-part-2.jpg","width":1600,"height":900,"caption":"North Atlantic Regional Data Line Mandate \u2013 Part 2: NAT DLM Roadmap"},{"@type":"BreadcrumbList","@id":"https:\/\/www.universalweather.com\/blog\/north-atlantic-regional-data-line-mandate-part-2-nat-dlm-roadmap\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.universalweather.com\/blog\/"},{"@type":"ListItem","position":2,"name":"North Atlantic Regional Data Link Mandate: Part 2 \u2013 NAT DLM Roadmap"}]},{"@type":"WebSite","@id":"https:\/\/www.universalweather.com\/blog\/#website","url":"https:\/\/www.universalweather.com\/blog\/","name":"Universal\u00ae Operational Insight Blog","description":"Expert insight and practical tips for business-aviation operations","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.universalweather.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4","name":"Mark Miller","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg","url":"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg","caption":"Mark Miller"},"description":"Mark is a former Air Traffic Controller with more than 35 years' experience in aviation. Prior to his departure, Mark served as the Universal Supervisor of Technical Planning, and was with Universal for approximately 27 years.","url":"https:\/\/www.universalweather.com\/blog\/author\/markmiller\/"}]}},"_links":{"self":[{"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/posts\/19934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/users\/58"}],"replies":[{"embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/comments?post=19934"}],"version-history":[{"count":1,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/posts\/19934\/revisions"}],"predecessor-version":[{"id":42607,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/posts\/19934\/revisions\/42607"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/media\/42606"}],"wp:attachment":[{"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/media?parent=19934"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/categories?post=19934"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/tags?post=19934"},{"taxonomy":"feed_exclusion","embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/feed_exclusion?post=19934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}