{"id":19792,"date":"2015-01-19T06:30:37","date_gmt":"2015-01-19T12:30:37","guid":{"rendered":"http:\/\/www.universalweather.com\/blog\/?p=19792"},"modified":"2024-04-11T10:31:28","modified_gmt":"2024-04-11T15:31:28","slug":"flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements","status":"publish","type":"post","link":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/","title":{"rendered":"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements"},"content":{"rendered":"<p><em>This business aviation blog post continues from our article last week, entitled &#8220;<a href=\"http:\/\/www.universalweather.com\/blog\/2015\/01\/flight-planning-rule-changes-for-canada-part-1-recent-changes\/\" target=\"_blank\" rel=\"noopener noreferrer\">Flight Planning Rule Changes for Canada: Part 1 \u2013 Recent Changes<\/a>.&#8221;<\/em><\/p>\n<p>Advances in avionics and Air Traffic Control (ATC) flight data processing systems are making it possible to reduce lateral separation within the busy North Atlantic Tracks (NATs). Current Minimum Navigation Performance Specifications (MNPS) airspace will soon be modified to increase capacity at optimal flight levels.<\/p>\n<p>The following is an overview of what you need to know about equipment requirements:<\/p>\n<h2>1. Aircraft equipment considerations<\/h2>\n<p>With implementation of additional Automatic Dependent Surveillance (<a href=\"http:\/\/www.universalweather.com\/blog\/tag\/ads-b\/\" target=\"_blank\" rel=\"noopener noreferrer\">ADS-B<\/a>) and radar facilities along the east coast of Canada, Gander ATC began offering Air Traffic Services (ATS) surveillance and VHF communications, at flight level 290 and above, beginning October 2010. As of November 2012, Controller-Pilot Data Link Communications (CPDLC) services have been offered to flights transiting Gander domestic and Gander oceanic airspace.<\/p>\n<h2>2. Timeframe for equipment upgrades<\/h2>\n<p>MNPS requirements on the NATs will go away as of 2020. At that point all aircraft operating on NATs will need to have appropriate mandated equipment and certifications. Be mindful that changes to CPDLC will be rolled out in phases, as noted in Aeronautical Information Circular (AIC) <a href=\"http:\/\/www.navcanada.ca\/EN\/products-and-services\/Documents\/AIP\/Current\/part_5_aic\/5aic_eng_2014_02.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">2\/14<\/a>. While low-level Blue Spruce routings over the North Atlantic are not affected initially, they may be in future. It could be that aircraft using low-level routings will need to be ADS-B-equipped, but this will depend on what Gander Oceanic and Iceland Oceanic implement over the coming years. No definitive or planned actions are currently known.<\/p>\n<h2>3. Participating in RLatSM trials<\/h2>\n<p>Operators who participate in this Reduced Lateral Separation Minimum (RLatSM) trial and who will be eligible to flight-plan RLatSM tracks must be:<\/p>\n<ul>\n<li>MNPS-approved<\/li>\n<li>RNP4-approved and<\/li>\n<li>ADS-B- and CPDLC-equipped and -certified<\/li>\n<\/ul>\n<p>Required communications, navigation, and surveillance systems must be operational, and crew members must report any failure of global positioning system, ADS-B, or CPDLC equipment to ATC as soon as it becomes apparent. For flight planning purposes, ATS systems use Field 10 (equipment) and Field 18 (other information) of the standard International Civil Aviation Organization (ICAO) flight plan to identify an aircraft&#8217;s data link and navigation capabilities:<\/p>\n<ul>\n<li>Field 10a (radio, navigation, and approach aid equipment\/capabilities)<\/li>\n<li>Field 10b (surveillance equipment\/capabilities)<\/li>\n<li>Field 18 (insert characters &#8220;PBN\/&#8221; followed by &#8220;L1&#8221; for RNP4)<\/li>\n<\/ul>\n<h2>Conclusion<\/h2>\n<p>Stay updated on changes that are taking place, and be aware that these are staggered changes and include test periods for new RLatSM. It&#8217;s important to work with your 3rd-party provider to ensure you&#8217;re familiar with new airspace fixes and national airspace redesign filing requirements.<\/p>\n<h2>Questions?<\/h2>\n<p>If you have any questions about this article or would like flight planning assistance for your next trip, contact me at <a href=\"mailto:markmiller@univ-wea.com\">markmiller@univ-wea.com<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Advances in avionics and Air Traffic Control (ATC) flight data processing systems are making it possible to reduce lateral separation within the busy North Atlantic Tracks (NATs). Current Minimum Navigation Performance Specifications (MNPS) airspace will soon be modified to increase [&#8230;]<\/p>\n","protected":false},"author":58,"featured_media":42639,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1675],"tags":[154,440,17,1132],"feed_exclusion":[],"class_list":["post-19792","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regulatory-compliance","tag-aviation-regulatory-issues","tag-canada","tag-flight-planning","tag-north-atlantic"],"acf":{"stealth_publish":false},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements<\/title>\n<meta name=\"description\" content=\"Advances in avionics and Air Traffic Control (ATC) flight data processing systems are making it possible to reduce lateral separation within the busy North Atlantic Tracks (NATs). Current Minimum Navigation Performance Specifications (MNPS) airspace will soon be modified to increase capacity at optimal flight levels.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements\" \/>\n<meta property=\"og:description\" content=\"Advances in avionics and Air Traffic Control (ATC) flight data processing systems are making it possible to reduce lateral separation within the busy North Atlantic Tracks (NATs). Current Minimum Navigation Performance Specifications (MNPS) airspace will soon be modified to increase capacity at optimal flight levels.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/\" \/>\n<meta property=\"og:site_name\" content=\"Universal\u00ae Operational Insight Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/universalweathr\" \/>\n<meta property=\"article:published_time\" content=\"2015-01-19T12:30:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-11T15:31:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mark Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@universalweathr\" \/>\n<meta name=\"twitter:site\" content=\"@universalweathr\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mark Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/\"},\"author\":{\"name\":\"Mark Miller\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4\"},\"headline\":\"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements\",\"datePublished\":\"2015-01-19T12:30:37+00:00\",\"dateModified\":\"2024-04-11T15:31:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/\"},\"wordCount\":448,\"image\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg\",\"keywords\":[\"aviation regulatory issues\",\"canada\",\"flight planning\",\"north atlantic\"],\"articleSection\":[\"Regulatory Compliance\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/\",\"url\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/\",\"name\":\"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements\",\"isPartOf\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg\",\"datePublished\":\"2015-01-19T12:30:37+00:00\",\"dateModified\":\"2024-04-11T15:31:28+00:00\",\"author\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4\"},\"description\":\"Advances in avionics and Air Traffic Control (ATC) flight data processing systems are making it possible to reduce lateral separation within the busy North Atlantic Tracks (NATs). Current Minimum Navigation Performance Specifications (MNPS) airspace will soon be modified to increase capacity at optimal flight levels.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#primaryimage\",\"url\":\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg\",\"contentUrl\":\"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg\",\"width\":1600,\"height\":900,\"caption\":\"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.universalweather.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/#website\",\"url\":\"https:\/\/www.universalweather.com\/blog\/\",\"name\":\"Universal\u00ae Operational Insight Blog\",\"description\":\"Expert insight and practical tips for business-aviation operations\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.universalweather.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4\",\"name\":\"Mark Miller\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg\",\"caption\":\"Mark Miller\"},\"description\":\"Mark is a former Air Traffic Controller with more than 35 years' experience in aviation. Prior to his departure, Mark served as the Universal Supervisor of Technical Planning, and was with Universal for approximately 27 years.\",\"url\":\"https:\/\/www.universalweather.com\/blog\/author\/markmiller\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements","description":"Advances in avionics and Air Traffic Control (ATC) flight data processing systems are making it possible to reduce lateral separation within the busy North Atlantic Tracks (NATs). Current Minimum Navigation Performance Specifications (MNPS) airspace will soon be modified to increase capacity at optimal flight levels.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/","og_locale":"en_US","og_type":"article","og_title":"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements","og_description":"Advances in avionics and Air Traffic Control (ATC) flight data processing systems are making it possible to reduce lateral separation within the busy North Atlantic Tracks (NATs). Current Minimum Navigation Performance Specifications (MNPS) airspace will soon be modified to increase capacity at optimal flight levels.","og_url":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/","og_site_name":"Universal\u00ae Operational Insight Blog","article_publisher":"https:\/\/www.facebook.com\/universalweathr","article_published_time":"2015-01-19T12:30:37+00:00","article_modified_time":"2024-04-11T15:31:28+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg","type":"image\/jpeg"}],"author":"Mark Miller","twitter_card":"summary_large_image","twitter_creator":"@universalweathr","twitter_site":"@universalweathr","twitter_misc":{"Written by":"Mark Miller","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#article","isPartOf":{"@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/"},"author":{"name":"Mark Miller","@id":"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4"},"headline":"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements","datePublished":"2015-01-19T12:30:37+00:00","dateModified":"2024-04-11T15:31:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/"},"wordCount":448,"image":{"@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#primaryimage"},"thumbnailUrl":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg","keywords":["aviation regulatory issues","canada","flight planning","north atlantic"],"articleSection":["Regulatory Compliance"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/","url":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/","name":"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements","isPartOf":{"@id":"https:\/\/www.universalweather.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#primaryimage"},"image":{"@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#primaryimage"},"thumbnailUrl":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg","datePublished":"2015-01-19T12:30:37+00:00","dateModified":"2024-04-11T15:31:28+00:00","author":{"@id":"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4"},"description":"Advances in avionics and Air Traffic Control (ATC) flight data processing systems are making it possible to reduce lateral separation within the busy North Atlantic Tracks (NATs). Current Minimum Navigation Performance Specifications (MNPS) airspace will soon be modified to increase capacity at optimal flight levels.","breadcrumb":{"@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#primaryimage","url":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg","contentUrl":"https:\/\/www.universalweather.com\/blog\/wp-content\/uploads\/2015\/01\/flight-planning-changes-for-canada-part-2-business-aviation.jpg","width":1600,"height":900,"caption":"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements"},{"@type":"BreadcrumbList","@id":"https:\/\/www.universalweather.com\/blog\/flight-planning-rule-changes-for-canada-part-2-future-equipment-requirements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.universalweather.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Flight Planning Rule Changes for Canada: Part 2 \u2013 Future Equipment Requirements"}]},{"@type":"WebSite","@id":"https:\/\/www.universalweather.com\/blog\/#website","url":"https:\/\/www.universalweather.com\/blog\/","name":"Universal\u00ae Operational Insight Blog","description":"Expert insight and practical tips for business-aviation operations","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.universalweather.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.universalweather.com\/blog\/#\/schema\/person\/333822fb4d0c46c7c0ede5ba089f42e4","name":"Mark Miller","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg","url":"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/af98616b8b324eb8b1ddc662dc7bc2bdadced6cf49bdbd09d32957133ef82c3e?s=96&d=mm&r=pg","caption":"Mark Miller"},"description":"Mark is a former Air Traffic Controller with more than 35 years' experience in aviation. Prior to his departure, Mark served as the Universal Supervisor of Technical Planning, and was with Universal for approximately 27 years.","url":"https:\/\/www.universalweather.com\/blog\/author\/markmiller\/"}]}},"_links":{"self":[{"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/posts\/19792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/users\/58"}],"replies":[{"embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/comments?post=19792"}],"version-history":[{"count":1,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/posts\/19792\/revisions"}],"predecessor-version":[{"id":42640,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/posts\/19792\/revisions\/42640"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/media\/42639"}],"wp:attachment":[{"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/media?parent=19792"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/categories?post=19792"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/tags?post=19792"},{"taxonomy":"feed_exclusion","embeddable":true,"href":"https:\/\/www.universalweather.com\/blog\/wp-json\/wp\/v2\/feed_exclusion?post=19792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}